Description
2010 Sparta Innovations Ship Loading Conveyor System. Equip Yourself with the Gold Standard.
Manufacture & Design
- Completely intact and functions well
- 3-Stage Free Fall Fixed Conveyor System
- Rated to load wood chips into vessels at a ate of 600 tons per hour
- Conveyor 1 (BC-1) receives material from Screw Reclaimer and conveys to BC-2 which then conveys material to BC-3.
- Once material is received by BC-3, the material is then loaded on to the vessels.
- Serial Numbers:
- BC-1:Â 2010-09-BC_1
- BC-2: 2010-09-BC_2
- BC-3: 2010-09-BC_3
Components & Inclusions
- Triple Screw Reclaimer Hopper Assembly
- Fabricated by BID Canada
- Capable of transferring 800 wood chips per hour
- (3) Heavy Duty Conveyors
- (2) Large Support Towers
- Instrumentation / Control Building
- Supporting Frame
- Chutes
- Catwalks
- Safety Guards
- All Engineered Drawings, Operation and Safety Manuals, Maintenance Records
Dimensions
- Total length of BC-1 to BC-3 Conveyor:Â 197.5′ with a 48″ Wide Cleated Belt
- Powered by (1) 100 HP, 600 Volt, 3 Phase Motor
- Total length of BC-3 to Ship:Â 64.3′ with a 48″ Wide Cleated Belt
- Powered by (1) 40 HP, 600 Volt, 3 Phase Motor